Onshore Construction Supervisor

Resume posted by Consulting Positions in Construction.
Desired position type: Any.
Location: Bang Pla Soi Chon Buri, Thailand

Request this CV/Resume

Summary

I am an experienced Multi-discipline Onshore Construction Supervisor over 20 years experience in the oil and gas industry field Construction Work of Fabrication, Inspection, Welding, Piping, Steel Structure: Module-LNG/GAS, Jacket Platform, Pipeline, Petroleum, Petrochemical, Oil & Gas, Power Plant Position QA/QC/ Supervisor Inspector with following international codes and standard ASME-B31.1/B31.3/ASMEII,V,VIII,IX,API-1104,AWS-D1.1,AS-1554.1,AS-2980,AS4100, AS-3679.2, offshore standard DNV-OS-F101,DNV-OS-C401,DNV-OS-B101,DNV-OS-C101,IACSNo.47,Rules-ABS/Part-2.

Skills

  • *Special Training: Welding Inspector CSWIP 3.1 Certificate of Attendance
  • *Certification NDT
  • ASNT Level II in Radiographic Testing.
  • *ASNT Level II in Magnetic Particle Testing.
  • *ASNT Level II in Liquid Penetrant Testing.

Spoken Languages

  • English (fluent/good working knowledge),
  • Thai – mother tongue

Education


Period: From Dec 2012 to June, 2013: Noble Drilling/Singapore

POSITION                        : QA/QC/Supervisor Welding Inspector/Structure/NDT 

Job, name                                             : JU3000N Jack-Up Drilling Unit/Jurong-Singapore/Unithai-Shipyard

Responsibilities:

►Inspection fabrication fit-up/dimensions check assembly follows ITP, refer project spec. required standard ABS Rules

    IACS/AWS D1.1/ASTM/ASME Section: V

►Inspection material verifies steel plate check, mill certificate review report follow standard ABS Rules 

    Grade A, B, D, and E, AH32&36, DH32&36, EH32&36

►Review procedure NDE reference construction specification acceptant criteria qualification, ABS-Rules

►Review & witness procedure PQR, WPS, welding consumables, follow project specs, standard ABS, AWS D1.1 

►Review report mechanical test carbon steel accept criteria follow standard ABS Rules, AWS D1.1

►Witness WQT process SAW, SMAW; FCAW welding qualified butt weld in plate position 1G+3G+4G 

    Acceptance criteria follow standard / AWS D1.1 

►Visual inspection acceptance criteria follow standard ABS Rules / AWS D1.1

►Check quality of weld MPI, UT and RT Inspection NDE report follow acceptance criteria standard ABS Rules

►Coordinator and inspection review document requires of fabrication workshop & site NDT reports. Form Contractor

►Supervise and management for all of quality control & Review and approval of final document MDR.


Period: From Sep to November 2012:   Technip /Australia

POSITION                         : QA/QC. Supervisor Piping Inspector 

Job, name                                              : Macedon Gas Plant Projects/Module-GAS/TNS/Bangpakong/Thailand                                                                 

Responsibilities: 

►Witness of materials verification and trace ability carbon steel, stainless & duplex steel for piping and structure

►Surveillance for welding of Steel Structure fabrication and Piping Pre-installation 

►Monitoring preheat and post heat as per procedure and project specification requirement.

►Visual inspection of welded joints for steel piping and structure

►Witness of dimension checking for piping and structure

►Reviewing for RT, PT, MPI, UT, PMI and report for piping

►Review and approval of Test package report as per piping system.

►Piping installation inspections in compliance with DWG, Piping system and project specification

►Witness of pressure testing and pre-commissioning for piping system 

►Review and approval of final document MDR.


Period: From March to August, 2012: Seadrill Distribution / Singapore

POSITION                      :  QA/QC. Supervisor Structural Inspector 

Job, name                                           :  WEST LINUS Projects at Unithai Shipyard Thailand

                                                             :  Fabrication Block: Leg well, Upper Guide, Lower Guide 

Responsibilities: 

►Inspection fabrication fit-up/dimensions check assembly follows ITP, project spec. offshore standard DNV-OS-C401

►Inspection material verifies steel plate for special & primary, secondary at Yield stress 500 and above visual inspection, 

    Dimensions check, mill certificate review report follow offshore standard DNV-OS-C101 grade NVE36, NVE500,

    AWS group I&II, NVA36, NVD500, NVD36, AH36, NVD500Z

►Review procedure NDE reference construction specification acceptant criteria qualification DNV-OS-C401, AWS D1.1

►Review & witness procedure PQR, WPS, welding consumables, follow offshore standard DNV-OS-C401, AWS D1.1 

►Review report mechanical test carbon steel accept criteria follow offshore standard DNV-OS-C401 section -1

►Witness WQT process MMAW, FCAW welding qualified butt weld in plate position 2G+3G and

    Cover all position acceptance criteria follow standard DNV-OS-C401-section.1/ AWS D1.1/ SAW qualified position 1G 

►Final visual inspection and testing acceptance criteria follow offshore standard DNV-OS-C401

►Monitor PT, MPI, UT and RT Inspection NDE report follow acceptance criteria offshore standard DNV-OS-C401

►Co-ordinator and inspection review document requires of fabrication workshop & site NDT reports. Form Contractor

►Supervise and management for all of quality control programs and system such as material, welding, 

    Visual & dimensional, Nondestructive testing ensure meet the project, review and approved document final MDR.


Period: From Dec, 2011 to Feb.            : Best Tech Engineering Thailand

POSITION                          : QA/QC. Supervisor Structural Inspector 

Job, name                                               : FMG.Solomon Projects

Responsibilities: 

►Inspection material verifies plate, H-Beam carbon use standard JIS G3106 Gr.SM490A, for thickness 12 to 40 mm. 

►Inspection material Identification of plate, beam, Fittings and Pipes as per AS-1554.1/AS-4100/AS-3679.2 

►Review procedure NDT, PQR, WPS, welding consumables, welded joint and process identification as per AS-1554.1 

►Witness welding PQR for process MMAW, FCAW, SAW materials carbon steel, follow AS-2980 and AS-1554.1 

►Witness mechanical test carbon steel and alloy steel follow AS-1554.1 and AS-2980

►Witness WQT follow AS-2980 welding process MMAW, FCAW of welding qualified 4G, SAW qualified 1G

►Inspection fabrication fit-up and assembly used standards and project specification. Require AS-1554.1 and AS-4100

►Inspection fit-up before welding and visual after welding follow ITP, WPS; follow standard AS-1554.1 and AS-4100

►Inspection beams built-up as follow AS-3679.2 and AS-4100

►Inspection monitor PT, MPI, UT and RT all Inspection and acceptance criteria shall be per code AS-1554.1 

►Co-ordinator and inspection review document requires of fabrication workshop and filed /NDT reports. Form Contractor

►Reviewed ensure Site queries, engineering modification done, Review the As built drawings.Review final MDR.


Period: From Oct, 2011 to Nov, 2011    :  Foster Wheeler International Corporation Thailand

POSITION                           :  QA/QC. Welding Inspector

Job, name                                                :  Esso Refinery Sriracha Clean Fuels Project  

Responsibilities:

►Carrying out all the inspections during the verification of material carbon steel, stainless steel and alloy steel

►Reviewed Material Mill Certificates of Fittings and Pipes as per ASME Sec.II, review procedure NDT as per Sec.V 

►Inspection fabrication and of piping spools used standards and project specification. 

►Inspection Fit-up before welding and visual after welding follow ITP, WPS, follow standard ASME-B31.3

►Witness WQT follow ASME-Sec.IX, and ASME-B31.3 

►Inspection ferrite test, PT, MPI, PMI and RT all Inspection and acceptance criteria shall be per code ASME-B31.3 

►Inspections done as per the Piping Test Package, Monitoring fabrication & testing operations ensuring 

   Compliance with drawings and specified Client approved procedures. 

►Co-ordinator and inspection review document requires of piping shop and filed /NDT reports by Contractor

►Inspection line check walks before hydro test. And Witness Hydro test. 

►Reviewed ensure Site queries, engineering modification done, Review the As built drawings. Review package 

   Check P&ID, drawing, certificate Equipments, clear list checked punch list, 

►Reviewed documents and final MDR


Period: From April, 2011 to Sep, 2011:  ExxonMobil Esso Highlands Limited Australia 

POSITION                         :  QA/QC. Supervisor Piping Inspector& Welding and Painting

Job, name                                              :  PNG LNG EPC4-Project  

Responsibilities:

►Carrying out all the Inspections during the Verification of Material carbon steel, Stainless Steel, Duplex stainless steel 

►Reviewed Material Mill Certificates of Fittings and Pipes as per ASME Sec.II, review procedure NDT as per Sec.V

►Witness welding PQR for materials carbon steel, stainless steel, duplex stainless steel

►Witness mechanical test for materials carbon steel, stainless steel and alloy steel follow ASME-Sec.IX, ASME-B31.3

►Inspection fabrication and of piping spools used standards and project specification. 

►Inspection fit-up before welding and visual after welding follow ITP, WPS; follow standard ASME-B31.3 and AWS-D1.1 

►Witness WQT follow ASME-Sec.IX, and refer. ASME-B31.3 







►Inspection ferrite test, PT, MPI and RT all Inspection and acceptance criteria shall be per code ASME-B31.3 

►Inspections done as per the Piping Test Package, Monitoring fabrication & testing operations ensuring 

►Co-ordinator and inspection review document requires of piping shop and filed /NDT reports. By Contractor

►Inspection line check walks before hydro test. And Witness Hydro test. 

►Reviewed ensure Site queries, engineering modification done, Review the As built drawings. Review package 

   Check P&ID, drawing, certificate Equipments, clear list checked punch list, 

►Inspection painting and Final documents reviewed MDR.


Period: From Oct 2009 to March 2010: Linde AG Engineering Division 

POSITION                        : QA/QC. Supervisor Piping Inspector& Welding and Painting

Job, name                                             : Karratha NRU-Project / Woodside Burrup PTY.LTD  

Responsibilities: 

►Inspections during the Verification of Material carbon steel, Stainless Steel, Duplex stainless steel 

►Reviewed Material Mill Certificates of Fittings and Pipes as per ASME Sec.II, reviewed procedure NDT as per Sec.V 

►Witness welding PQR for materials carbon steel, stainless steel, duplex stainless steel

►Witness mechanical test carbon steel, stainless steel, duplex stainless steel follows ASME-Sec.IX, ASME-B31.3

    And AWS-D1.1

►Witness WQT follow ASME-Sec. IX and refer. ASME-B31.3, AS-2980

►Inspection fit-up before welding and visual after welding follow ITP, WPS, follow standard ASME-B31.3, 

►Inspection ferrite test, PT, MPI and RT all Inspection and acceptance criteria shall be per code ASME-B31.3 

►Inspections done as per the Piping Test Package, Monitoring fabrication & testing operations ensuring 

    Compliance with drawings and specified Client approved procedures. 

►Co-ordinator and inspection review document requires of piping shop and filed /NDT reports. By Contractor 

►Inspection line check walks before hydro test. And Witness Hydro test. 

►Reviewed ensure Site queries, engineering modification done, Review the As built drawings. Review package 

    Check P&ID, drawing, certificate Equipments, clear list checked punch list, 

►Supervise and management for all of quality control programs and system such as material, welding,

    Visual & dimensional, Nondestructive testing, Inspection painting and Final documents reviewed MDR.


Period: From July, 2009 to Sep. 2009: CHIYODA THAILAND LIMITED 

POSITION                        : QA/QC. Supervisor Piping Inspector & Welding 

Job, name                                             : TMMA- Project at Rayong

Responsibilities: 

►Reviewed Material Mill Certificates of Fittings and Pipes as per ASME Sec.II, review procedure NDT as per Sec.V

►Witness welding PQR for materials carbon steel, stainless steel.

►Witness mechanical test carbon steel, stainless steel follow ASME-Sec.IX, ASME-B31.3

►Inspection fabrication and of piping spools used standards and project specification. 

►Inspection fit-up before welding and visual after welding follow ITP, WPS, follow standard ASME-B31.3, 

►Witness WQT follow ASME-Sec.IX, and ASME-B31.3 

►Inspection ferrite test, PT, MPI and RT all Inspection and acceptance criteria shall be per code ASME-B31.3 

►Inspections done as per the Piping Test Package, Monitoring fabrication & testing operations ensuring 

    Compliance with drawings and specified Client approved procedures. 

►Co-ordinator and inspection review document requires of piping shop and filed /NDT reports. By Contractor

►Inspection line check walks before hydro test. And Witness Hydro test. 

►Reviewed ensure Site queries, engineering modification done, Review the As built drawings. Review package 

    Check P&ID, drawing, certificate Equipments, clear list checked punch list, 

►Inspection painting and Final documents reviewed MDR.


Period: From April. 2008 to Feb. 2009: Hindustan Oil Exploration Company Limited

POSITION                        : QA/QC. Supervisor Structural & Welding Inspector and Painting

Job, name                                    : PY-1 Gas Field Development Project    

Responsibilities: 

►Ensure all works has been doing by Subcontractor such as Sub Sea Fabrication at CUEL Yard, Sriracha complies

    With Project Specification as per AWS D1.1, ASME.B31.3, ASME Sec. IX  

►Inspection: Materials verify pipe carbon API5L Gr-B, X52, X65 Dia.3”,6”,8”,10”,12”,14”,16”, 24”and steel Pipe and 

    plate carbon API 2W Gr.60,API 2H Gr.50 thickness 10MM,16MM,20MM,25MM,30MM,40MM,75MM.

►Reviewed Material Mill Certificates of Fittings and Pipes as per ASME Sec.II, review procedure NDT as per Sec.V

►Witness welding PQR for materials carbon steel, stainless steel. And WQT follow ASME-Sec.IX, AWS-D1.1

►Witness mechanical test carbon steel, stainless steel follow ASME-Sec.IX, ASME-B31.3

►Witness WQT follow ASME-Sec.IX, and AWS-D1.1

►Inspection welding joint T, K and Y connections for critical structures Welders qualify position 6GR only.

►Witnessed and review report RT, UT, MPI, and PT 

►Inspection structural & Piping Weld Inspection Before during and after during Fabrication of Leg jacket Structure, 

    Deck House Structure, Helideck Structure.

►Piping Inspection on all the piping systems during the bevel preparation spool fabrication, Monitoring, Tracking 

    Witness hydro Testing, Reinstatements, Updating the Drawing Revision, Monitored the Technical Query 


►Review as-built condition issued the punch list, Non-Conformance Reports (NCR)  

►Inspection Report, Observation Notices witnessed & performed NDT 

►Monitoring NDT activities Interpreted all the NDT reports and compilation of the signed reports. 

►Co-ordinator and inspection review document requires of piping shop and filed /NDT reports. By Contractor

    With customer and the quality assurance department for Stage by stage in ASME codes, AWS D1.1

►Inspection: Coating of detail: Qualify Panel test for Adhesion before coating Production and checked 

    Surface profile, Humidity test, before primer coat follow painting Spec., Checked surface DFT before second coat

►Reviewed document and final MDR


Period: From July, 2007 to April, 2008: Allseas Engineering bv Australia

POSITION                         : QA/QC. Supervisor Structural & Welding Inspector and Painting

Job, name                                              : Reliance Dhirubhai Development Project Sub sea Manifold Structural Responsibilities: 

►Ensure all works has been doing by Subcontractor such as Subsea Manifold Structural and Sub Sea Pipeline 

    Fabrication at CUEL Yard, Sriracha complies Project Specification, AWS. D1.1 Offshore Standard DNV-OS-F101 

►Inspection: material verify pipe carbon API5L Gr.X52, X65 Dia.3”,6”,8”,10”,12”,14”,16”, 24” and steel 

    Plate carbon API2W Gr.60, API2H Gr.50 thickness 10MM, 16MM, 20MM, 25MM, 30MM, 40MM, 63.5MM

►Reviewed Material Mill Certificates of Fittings and Pipes as per ASME Sec.II, review procedure NDT as per Sec.V 

►Witness welding PQR for materials carbon steel, stainless steel, duplex stainless steel

►Witness mechanical test carbon steel, stainless steel and alloy steel follow ASME-B31.3 and DNV-OS-F101

►Witness WQT follow ASME-Sec.IX and DNV-OS-F101

►Inspection fabrication and of piping spools used standards and project specification. Require 

►Inspection fit-up before welding and visual after welding follow ITP, WPS; follow standard ASME-B31.3 and AWS-D1.1 

►Inspection ferrite test, monitor PT, MPI and RT all Inspection and acceptance criteria shall be per code ASME-B31.3 

►Inspections done as per the Piping Test Package, Monitoring fabrication & testing, Inspection witness hydro test. 

►Reviewed ensure Site queries, engineering modification done, Review the As built drawings. Review package 

    Check P&ID, drawing, certificate Equipments, clear list checked punch list, 

►Inspection: coating of detail Qualify Panel test before coating Production, chloride content test, 

    Visual oil test before blasting and checked surface profile, salt test, before primer and Checked surface, DFT

►Inspection painting and Final documents reviewed MDR.

 

Experience

B.Ed. BansomdejchaoprayaInstitute Bachelor degree of Education in computer education

           : Diploma Pathumwan Technical Collage Major welding industrial Technology       

1865 total views, 2 today