Facility Manager ( Utility Maintenance Manager )

Resume posted by Consulting Positions in Engineering.
Desired position type: Full-Time.
Location: Bang Phli Samut Prakan, Thailand

Request this CV/Resume

Summary

Experience in 1.Maintenance 2.Purchasing 3. Freelance recruitment

Skills

    Spoken Languages

    • English - moderate,
    • Thai

    Education

    King Monkut’s university of technology north Bangkok, Thailand
    Bachelor Degree of Electrical Engineering, April 1999 GPA.2.8

    Training

    • Safety Committee
    • CIPS level 2 introductory Certificated in Purchasing and Supply Chain
    • ISO9000 auditor, Etc.
    • Building Inspection Certificated

     

    Licenses

    • Building Inspection License
    • Electrical Engineer License
    • Thai Driving License

    Experience

    Johnson Control World Service Co, Ltd. 2010-Now
    Customer Business Manager (Facility Management Service) 2010-Now
    Manage a staff of 21 persons, 3rd Party direct 49 persons and other Sub-contractor to service Office Building and Utility
    System

    1. Hard Service – Operation & Maintenance (Preventive, Predictive , Corrective and Design Out Maintenance) for Boiler ,Air Compressor, Chiller, HVAC, Building , Supply Water Treatment, Waste Water treatment and Fire Alarm & Fire Protection System.
    2. Soft Service – Service and Deliver for Cleaning & Pest Control, Security, Uniform &Laundry, Reception, Transportation and Safety

    Key Priority to Managing the team

    1. Customer Centricity
    2. Employee Centricity
    3. Safety
    4. Asset Care
    5. Financial Management

    Customer Business Manager (Facility Management Service at Malaysia) Mar 12 – May 12

    • Redundant manager for managing facility service the site at Malaysia, manage 2 site Thailand and Malaysia Site.

    Double A (1991) PLC.,Thailand , 1999-2010
    Purchasing Manager Manager PPH and Secretary of PCC 2007-2010

    • Responsible all maintenance and repair spare part needs for pulp& paper mill and 1,000 AA truck. Managed a staff of 14 and assumed responsibility for developing an annual operating budget. Sourced and negotiated pricing for 20,000 items with an annual purchased value of 400 million baht including establishing blanket purchase agreements and bulk commodity pricing agreements. Secretary of PCC has response for implement system and follow assignment from PCC.

    Maintenance Manager, 2005-2007

    • Managed a staff of 35 who did preventive and corrective maintenance in Pulp Process, Recovery Boiler, Turbine, Air Compressor and Water Treatment and Effluent. Implement maintenance way to reduce downtime 50%, by prediction and tracking root cause Project management for upgrading 790 ADT to 850 ADT that increase annual profit 147 million baht.

    Automation and Instrument Engineer,2002-2005

    • Supervised a team who did Preventive and Corrective Maintenance on Instrument Equipment, Instrument Calibration, Siemens PLC and ABB DCS System Response in new projects, which will implement our plant, includes designs, planning, and commissioning in Instrument and Automation Equipment are responded such as Control Valves, Actuators, Positioner, Pneumatic and Hydraulic Equipment, Pressure&Temperature Sensor,Transmitter and Analyzer.

    Shift Engineer 1999-2002

    • Supervised a shift team who operated the 750 ADT pulp1 process and Turbine&boiler process.

    1542 total views, 1 today