Business Process Improvement Consultant
Summary
Lean Six Sigma Consultant with more than 10 years experience. Positions and consulting engagements in various industries, including Automotive, Electronic Display, Electronic Manufacturing Service and Sanitary ware
Specialities
- Business Process Improvement,
- Cost Reductions,
- Kaizen Improvement,
- Lean Six Sigm
Skills
Spoken Languages
- English (Fluent),
- Tha (Fluent)
Education
Srinakharinwirot University
114 Sukhumvit 23, Bangkok 10110, THAILAND
Bachelor of Engineering, Electrical Engineering
March 2002
Experience
LIXIL Asia, 2010-Present
Operations Business Excellence Manager and Master Black Belt
- Executed improvements in core business processes such as:
- Order to Cash lead-time reduction resulted in 30 % process step reduction with $560K in cash-flow saving led by Customer Service, IT, Sales, Logistic and Finance.
- UPC Project Sales Improvement to improve Sales Revenue 15%
- Project Win Rate Improvement to increase the wining project 47% with Sales Team
- Claim Process Lead-time Reduction 50% led by IT, QA, Customer Service and Marketing
- 30% Glost productivity within in 5 months and extend mold life from 60 to 220 cycles in Manufacturing area
- Won the 2nd Prize and Most Popular project award in Business Excellence Contest 2011, American Standard Asia Pacific.
- Continuously drive breakthrough improvement on Supply Lead Time, Demand Forecast Accuracy, Cost out Productivity, Process Reengineering, Cash Optimization, Quality Improvement…etc.
- Implemented Balance Scorecard System (BSC) and integrated to Lean Six Sigma improvement.
- Trained/coached and certified BB/GB/ Fundamentals (FDT) Belters more than 100 belters, actively engage belters in related projects.
- Conducted business excellence audit to ensure lean & effective processes via Process Capability Assessment Tool (PCAT) for various functions and countries.
Goodyear (Thailand) Public Limited, 2009-2010
Continuous Improvement Specialist and Black Belt
- Be the first pioneer of Kaizen implementation in a global company.
- Executed the Lean Six Sigma and The New Science of Fixing Things concept to improve a Tire Manufacturing with 50% reduction in changeover and 30% reduction in Bladder leak with $0.2M in saving.
- Set up the Lean Six Sigma Plan to identify the improvement opportunities throughout the plant and integrated Lean Six Sigma into plant’s KPI.
- Trained/coached and certified more than 10 GB belters in related projects.
Kimball Electronics (Thailand) Limited, 2006-2009
Lead Black Belt
- Set up Lean Six Sigma Plan to identify the improvement opportunities across company to reduce cost 30% such as SCM which focused on Slow Moving Part reduction 10% and Financial which focused on Account Receivable Days Reduction15% with our customer.
- Trained/coached and certified more than 32 Green belters with Lean Six Sigma Projects.
- Implemented Lean Six Sigma to increase productivity30%, set up time reduction 30% and Kanban system in SMT line.
LG Electronics (Thailand) Co.,Ltd, 2002-2006
QA Engineer and Six Sigma Engineer
- Trained/coached and certified more than 200 projects resulting in waste elimination saving such as Productivity, Defect Reduction and etc.,
- Mapped, investigated, analyzed and improved business processes.
- Built the improvement culture by implementing Innovation School.
GUEST LECTURER
• Technology Promotion Association (Thailand-Japan) Institute:
– Business Process Improvement
– Lean Master Co-Instructor
• SME Lean Thailand Committee, 2010-2011
CERTIFICATE
- Trained Six Sigma Master Black Belt, Uniworld Consulting Group, Taiwan.
- Certified Six Sigma Black Belt in 2010, The Goodyear Tire & Rubber Company, USA.
- Certified Lean Master in 2009, Technology Promotion Association (Thailand-Japan) Institute.
- Certified Six Sigma Black Belt in 2004, LG Electronics (Display Division) Co.,Ltd,, Korea.
PROJECT EXPERICENCES
- Saved cash-flow $560K from Invoice Process Improvement by increasing the number of customer receiving the invoice within 3 days from 5% to 86%, American Standard(Philippines).
- Saved $50K from Glost Productivity Improvement by reducing the total hours/pieces by 40%, American Standard(Thailand).
- Saved $185K from Casting Mold defect reduction by 45%, American Standard(Thailand).
- Saved cash-flow $340K from Order to Cash Process by reducing the number of process steps & Credit Note by 30%, American Standard(Thailand).
- Saved $0.7M from Retail Pricing Control by reducing On-Billing Discount by 20%, American Standard(Thailand).
- Saved $60K from Kanban system with Tire Building and result in WIP reduction30%, Goodyear(Thailand) Public Limited.
- Saved $0.1M from Quick Changeover by reducing from 1hr to 10 minutes in Tire Building Machine, Goodyear(Thailand) Public Limited.
- Saved $0.2M from Bladder defect reduction by 30%, Goodyear(Thailand) Public Limited and etc.,.
1678 total views, 3 today