Achieved the requirement of new plant start up in 2001. These also included masterminding, design, planning, execution number of expansion and improvement project, LEAN manufacturing concept, packing machine performance above 85 % of Overall Plant Effectiveness (OPE).
Implemented preventive maintenance systems and spare-parts inventory systems, by using Computerized Maintenance Management System (CMMS).
Implemented ISO 14001 system and achieved the certification within 3 months.
Control energy saving at utility plant as well as cost saving for maintenance budget. Implemented energy reduction program and overall energy cost saving 0.3 MTHB per month.

Skills

  • MicroSoft Office (Word, Excel and PowerPoint),
  • Computerized Maintenance Management System (CMMS),
  • Hazard and operations (HAZOP),
  • Risk assessment

Spoken Languages

  • English,
  • Thai

Education

2004 – 2005 / Graduate School of Business Administration

  • The National Institute of Development Administration (NIDA)
  • Master of Business Administration (Executive M.B.A.) in general management

1991 – 1993 / Kingmongut’s Institute of Technology Ladkrabang
(KMIT’L Faculty of Engineering)

  • Bachelor of Industrial Technology in Industrial instrumentation technology

1981 – 1982 / Rachamongkol’s Institute of Technology Bangkok Campus

  • Diploma of Technical in Electrical Power

1978 – 1980 / Samuthprakarn Technical College

  • Certification of Technical in Electrician

Experience

2001– 2011 / Molnlycke Health Care (Thailand) Limited (Swedish Company)
Medical Device      
Maintenance Manager

  • Set up production lines and new project to start as target schedule for new plant.                                 
  • Set up Lean concept manufacturing.
  • Implemented GMP (Good Manufacturing Practice).
  • Managed and maintain all facilities such as: HVAC, R/O, generators, fire hydrant, chillers, cooling towers and fire alarm system.
  • Analyzed the root causes of machines breakdown (Why-why analysis and fishbone) and implemented process improvement circle (Kaizen) and TPM.
  • Implemented and managed plant maintenance program.
  • Coached, motivated and trained all engineers and technician staff.
  • Set up and monitored spare parts inventory and minimized order level.
  • Prepared all expenditures, investments and kept in line with budget.
  • Responsible for all factory staff and machines operation are adequately trained to company policy and procedure as it related to Health & Safety and the Environment.

Achievement:

  • Achieved the requirement of new plant start up in 2001. These also included masterminding, design, planning, execution number of expansion and     improvement project, LEAN manufacturing concept, packing machine performance above 85 % of Overall Plant Effectiveness (OPE).
  • Implemented preventive maintenance systems and spare-parts inventory systems, by using Computerized Maintenance Management System (CMMS).
  • Implemented ISO 14001 system and achieved the certification within 3 months.
  • Control energy saving at utility plant as well as cost saving for maintenance budget. Implemented energy reduction program and overall energy cost saving 0.3 MTHB per month.

1993 – 2001 / Zeneca Agro Asiatic, LTD (European Company) Chemical
Engineering & Project Manager

  • Directly managed and responsible for engineering, maintenance works, as well as project management.
  • Designed, developed and implemented capital improvement projects to reduce costs.
  • Managed and handled cost estimating, project scheduling, bidding and supervision all contractors.

Engineering & Maintenance Manager

  • Designed and implemented procedures for engineering, maintenance and quality system (ISO 9002).
  • Conducted safety program and trained staff to comply with Safety Health and Environment (SHE) standard.

Works Engineer

  • Planned, scheduled and followed preventive maintenance works to prevent downtime.
  • Control maintenance works to ensure that all of them are completed within deadlines.

Achievement:

  • Achieved the required output since 1993. These also included masterminding, design, planning, and execution of number of expansion and improvement project such as expansion of 4-4 Bipyridyl quaternisation to paraquat formulation and packing to triple the nominal capacity, warehouse construction project, non-paraquat plant construction project i.e. Insecticide(Karate), Fungicide(Amistar) formulation project. Auto bulk filling and move on conveyor line project, conveyor line from packing plant to warehouse project.
  • Implemented / National Semiconductor, LTD (USA Company) Electronic Device

Technician

  • Supervised maintenance technician followed preventive maintenance schedules.
  • Developed and modified existing machines to support production.

Achievement:

  • Achieved the requirement of Zero Defect Maintenance in 1987. These also included masterminding, design, planning and execution of number of expansion and improvement project such as expansion of manufacturing lines and testing machines such as temperature testing m/c, solder plating m/c.

1982 – 1983 / Bangkok Steel Industrial, LTD
Electrician

  • Installed and controlled electrical systems for turn key plants.

Achievement:

  • Achieved plant installation and test run of sugar plant, cassava plant included their control system testing.